Look while the work
is still visible.
Once drywall is installed, much of the rough-in work is concealed. Coordinate access with your builder after the relevant framing and mechanical, electrical, and plumbing rough-ins are ready, before insulation and wall coverings conceal them.
- Visible framing conditions, connections, and penetrations.
- Accessible plumbing, electrical, and HVAC rough-ins.
- Visible moisture-management details at accessible openings and exterior components.
- Documented observations to discuss with your builder before the next stage.
The exact timing depends on construction progress and builder access. This is a visual inspection, not engineering design review or code certification.